Local Information
Planning
Information about planning
CPC Comments: No objection
Work in preparation of Carrington Strategic phase 2 employment areas
110524/FUL/23 | Retrospective application for the erection of two stable blocks and hardstanding. | North Cheshire Equestrian Centre Carrington Lane Carrington Manchester M31 4AE
110320/FUL/23 | Construction of a 1,040 MW Battery Energy Storage System (BESS) facility comprising: containerised battery units with transformer units and inverter cabinets; internal access tracks; electrical substation compounds including transformers and associated switchgear equipment; infrared CCTV fixed on poles; perimeter fencing; underground surface water drainage infrastructure; vehicular parking area; and site welfare facilities. | Power Station 132 Manchester Road Carrington M31 4AY